
Old drive, 8/11/2016.
What a transformation. The drive to the WEC was nothing but potholes on Thursday.
Then on Friday, two loads of gravel were delivered.
Now Saturday morning we have a great looking drive.

Two loads of gravel for the drive, 8/12/2016.

New drive, 8/13/2016.
A big Thank You to Dunn Construction for their gravel donation, and to Franklin Enterprises for spreading the gravel.