New drive to the WEC!!

Old drive, 8/11/2016.

Old drive, 8/11/2016.


What a transformation. The drive to the WEC was nothing but potholes on Thursday.

Then on Friday, two loads of gravel were delivered.

Now Saturday morning we have a great looking drive.

Two loads of gravel for the drive, 8/12/2016.

Two loads of gravel for the drive, 8/12/2016.

New drive, 8/13/2016.

New drive, 8/13/2016.

A big Thank You to Dunn Construction for their gravel donation, and to Franklin Enterprises for spreading the gravel.

Posted in Guild Info.

Leave a Reply

Your email address will not be published. Required fields are marked *